Ötztaler Achbridge (analysis)

A detailed assessment of the condition of an object.

Properties

Element type
:
Analysis
Summary
:
The time recording of the measurement data took place in the period from August 25, 2011 to June 30, 2013. On the basis of long-term measurements during this period, the stretching / displacement behavior of the rails in particular was described.
Case type
:
Other
Initiation of assessment
:
Required reliability check (by owner or authorities), Pure research interest
"Required reliability check (by owner or authorities)" is not in the list (Anticipated change of design working life, Required reliability check, Post event and anticipated damage, Structural deterioration, Pure research interest, Other) of allowed values for the "Initiation of assessment" property.
Predominant verification type
:
Design value criteria
Predominant verification scale
:
Structural system
Structural analysis
:
Ultimate limit state
Information updating
:
Direct non-bayesian
Operational intervention
:
Monitoring

Relations with other elements