Brama Przemyska

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2012
Composed of materials
:
Gravel - mixed concrete, Steel
Description
:
The bridge was built in 2012. The bridge is situated in Przemysl (South-East Poland) over San River. It has a total length 229,5 m. The bridge had two-span facility (114 m). This bridge is very important for the city (Przemysl). The bypass allows to eliminate transit traffic from the city centre. It facilitates access to the border crossing with Ukraine in Medyka.
Location coordinates
:
49.79783728586549, 22.784632811540153
Country
:
Physical address
:
Przemyśl
Loading map...