Bridge in Puławy

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2008
Composed of materials
:
Steel
Description
:
The bridge was built in 2008. The bridge is situated in Pulawy over Wisla River. It has a total length 1038,2 m. The bridge in a fourteen-span arrangement. The lengths of the spans are: 44 m, 3 x 56 m, 6 x 64 m, 80 m, 212 m, 80 m and 44 m. The main span is suspended from steel arches load-bearing with bar hangers.
Location coordinates
:
51.43740278109997, 21.943488566742133
Country
:
Physical address
:
Puławy
Loading map...