Brug Terneuzen (case study)
(No description available.)
Object description
(No object description available.)
Civil engineering type
:
network Bridge
Year of construction
:
1969
Composed of materials
:
Location coordinates
:
Country
:
Object analysis
(No analysis summary available.)
Case type
:
Object state
(No object state summary available.)
Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Images
(No images available for this case study.)
Documents
(No documents available for this case study.)
This case study was contributed by Asma Manai of TNO. Last edited by technical staff.