In a research program, loads and deflections were monitored on four bridges along the line. One bridge, that had been taken out of service, was transported to Luleå University of Technology. It was there tested in fatigue with the planned axle load.
Case type
:
Research
Initiation of assessment
:
Anticipated change of design working life, Required reliability check (by owner or authorities)
"Required reliability check (by owner or authorities)" is not in the list (Anticipated change of design working life, Required reliability check, Post event and anticipated damage, Structural deterioration, Pure research interest, Other) of allowed values for the "Initiation of assessment" property.
Predominant verification type
:
Qualitative criteria
Predominant verification scale
:
Structural system
Structural analysis
:
Fatigue limit state
Operational intervention
:
Load restriction or change of use, Monitoring