Feuerwehrzufahrt TU Vösendorf (case study)
Simple overpas, frame bridge.
Object description
(No object description available.)
Civil engineering type
:
Road network Bridge
Year of construction
:
2006
Composed of materials
:
Location coordinates
:
48° 7' 14.04" N, 16° 19' 29.61" E
Country
:
Object analysis
Crack monitoring incl. Temp. 1value/h
Case type
:
Consulting
Object state
(No object state summary available.)
Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Cracks (width/length/pattern)
Images
Documents
(No documents available for this case study.)
This case study was contributed by Fritz Binder of Asfinag Baumanagement GmbH. Last edited by technical staff.