Loading map...
{"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"auto","height":"350px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[],"onlyVisibleOnHover":false,"fillColor":"#FF0000","fillOpacity":"0.5"}],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":false,"defzoom":6,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EFootbridge in Nowy S\u0105cz\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EThe footbridge was built in 2019 over Kamienica River. It was built as part of the European network (EuroVelo cycle routes). It has a span length 78 m, usable width 2,5 m and maximum height of structure 10 m. The deck (panels) of the bridge is made from hybrid concrete-composite. The material which was used to panel performance is FRP polymers.\n\u003C/p\u003E\u003C/div\u003E","title":"Footbridge in Nowy S\u0105cz\n","link":"","lat":49.63176972694055,"lon":20.688855886457475,"icon":"/images/imsafe/c/c8/Blue-marker.png"}],"imageoverlays":null}