German bridge examined by e.g. Hansen (case study)

A four-span post-tensioned concrete bridge was investigated for fatigue. One box-shaped girder serves each direction of travel. The closed box cross section prevents the equipment from vandalism.


Object description

A four-span post-tensioned concrete bridge was investigated for fatigue. One box-shaped girder serves each direction of travel. The closed box cross section prevents the equipment from vandalism.

Civil engineering type
:
Road network Bridge
Year of construction
:
Composed of materials
:
Location coordinates
:
Country
:

Object analysis

An assessment of structure specific fatigue was carried out. Traffic axle loads and the resulting strains in the tendons were measured. The fatigue assessment was based on S-N-curves and the PM-rule for accumulation of damage.

Case type
:
Research

Object state

Global deflection was measured at two locations of the bridge. Strain gauges and temperature sensors were installed at a number of locations, and axle loads were measured after calibration to known axle loads. A fatigue assessment was carried out for concrete, reinforcement and tendons.

Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Deformation, Traffic information via WIM/BWIM

Images

(No images available for this case study.)

Documents

Icon-link2.png



This case study was contributed by Frida Liljefors of Norwegian University Of Science And Technology. Last edited by technical staff.