Germany
Properties
Element type
:
Country
Country code
:
DE
Case studies
The following case studies are available in Germany:
- Bavarian tunnel (case study) (created: 12-08-2021)
- Cable-stayed bridge Obere Argen (case study) (created: 16-09-2021)
- German bridge examined by e.g. Hansen (case study) (created: 12-08-2021)
- Grünbrücke as a timber construction (case study) (created: 16-09-2021)
- Weidatalbrücke (RFB Göttingen) (case study) (created: 16-09-2021)
Partner organisations
The following IM-SAFE partner organisations are located in Germany:
- AEC3 (Organisation type: Commercial)
Maintenance management data
Routine monitoring interval
:
6 (years)
Inspection interval
:
3 (years)
Main inspection interval
:
6 (years)
Number of condition classes
:
6
Phase I maintenance strategies
:
Preventive maintenance
Corrective maintenance
Corrective maintenance
Phase II maintenance strategies
:
Preventive maintenance
Predictive maintenance
Predictive maintenance
Phase III maintenance strategies
:
Preventive maintenance
Predictive maintenance
Predictive maintenance
Data informed static quality control elements
:
Preparatory work
On-site inspection
Laboratory test
Assessment of condition or reliability
Assessment of safety
On-site inspection
Laboratory test
Assessment of condition or reliability
Assessment of safety
Data informed dynamic quality control elements
:
Static quality control frameworks
:
Inventory
Vulnerable zones
Failure mode
Vulnerable zones
Failure mode
Dynamic quality control level
:
CI