Italy
Properties
Element type
:
Country
Country code
:
IT
Case studies
The following case studies are available in Italy:
- Colle Isarco bridge (case study) (created: 12-08-2021)
- Fiume Po Bridge (case study) (created: 16-09-2021)
- Gad Bridge (case study) (created: 16-09-2021)
- Musmeci bridge (case study) (created: 12-08-2021)
- Neumarkt bridge (case study) (created: 12-08-2021)
- Passerella Olimpica (case study) (created: 16-09-2021)
- Viaduct SS335 (case study) (created: 16-09-2021)
Partner organisations
The following IM-SAFE partner organisations are located in Italy:
- SafeCertifiedStructure Ingegneria S.r.l. (Organisation type: Commercial)
Maintenance management data
Routine monitoring interval
:
6 (years)
Inspection interval
:
3 (years)
Main inspection interval
:
5 (years)
Number of condition classes
:
6
Phase I maintenance strategies
:
Preventive maintenance
Corrective maintenance
Corrective maintenance
Phase II maintenance strategies
:
Preventive maintenance
Corrective maintenance
Corrective maintenance
Phase III maintenance strategies
:
Preventive maintenance
Corrective maintenance
Predictive maintenance
Corrective maintenance
Predictive maintenance
Data informed static quality control elements
:
Preparatory work
On-site inspection
Laboratory test
Assessment of condition or reliability
On-site inspection
Laboratory test
Assessment of condition or reliability
Data informed dynamic quality control elements
:
Assessment of remaining service life
Static quality control frameworks
:
Inventory
Vulnerable zones
Vulnerable zones
Dynamic quality control level
:
CI