Pfaffenbergbrücke (analysis)

A detailed assessment of the condition of an object.

Properties

Element type
:
Analysis
Summary
:
Through the targeted arrangement of sensors and measuring instruments, air, rail and structure temperatures, relative longitudinal displacements of the structure and relevant deformation parameters of the rails (expansion and compression) were measured and documented as part of a continuous measurement program.
Case type
:
Other
Initiation of assessment
:
Required reliability check (by owner or authorities), Pure research interest
"Required reliability check (by owner or authorities)" is not in the list (Anticipated change of design working life, Required reliability check, Post event and anticipated damage, Structural deterioration, Pure research interest, Other) of allowed values for the "Initiation of assessment" property.
Predominant verification type
:
Design value criteria
Predominant verification scale
:
Structural system
Structural analysis
:
Ultimate limit state
Information updating
:
Direct non-bayesian
Operational intervention
:
Monitoring

Relations with other elements