Rędziński Bridge

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2011
Composed of materials
:
Reinforced concrete, Steel
Description
:
The bridge was built in 2011. The bridge is situated in Wroclaw over Odra River. It has a total length 612 m and width 38,58 m. The bridge in a four-span arrangement. The lengths of the spans are: 50 m, 256 m, 256 m and 50 m. This bridge has got the highest pylon in Poland (122 m). In this case was designed H-type reinforced concrete pylon which was common for both load-bearing structures.
Location coordinates
:
51.156786034691926, 16.95941449810424
Country
:
Physical address
:
Wrocław
Loading map...