Semmering Base Tunnel (case study)
The Semmering Base Tunnel is a railway tunnel with two tubes, each 27,3 km long. It is built with reinforced tunnel lining segments and shotcrete.
Object description
(No object description available.)
Civil engineering type
:
Railway network Tunnel
Year of construction
:
2012
Composed of materials
:
Location coordinates
:
47° 36' 13.80" N, 15° 43' 55.63" E
Country
:
Object analysis
(No analysis summary available.)
Case type
:
Consulting
Object state
(No object state summary available.)
Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Deformation, Displacement, Dynamic response (acceleration/damping/frequencies), Load bearing capacity, Spatial properties (concrete cover/duct voids), Other actions (wind/temperature/earthquake), Cracks (width/length/pattern)
Images
(No images available for this case study.)
Documents
This case study was contributed by Werner Lienhart of Graz University of Technology. Last edited by technical staff.