Semmering Base Tunnel (case study)

The Semmering Base Tunnel is a railway tunnel with two tubes, each 27,3 km long. It is built with reinforced tunnel lining segments and shotcrete.


Object description

(No object description available.)

Civil engineering type
:
Railway network Tunnel
Year of construction
:
2012
Composed of materials
:
Location coordinates
:
47° 36' 13.80" N, 15° 43' 55.63" E
Country
:
Loading map...

Object analysis

(No analysis summary available.)

Case type
:
Consulting

Object state

(No object state summary available.)

Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Deformation, Displacement, Dynamic response (acceleration/damping/frequencies), Load bearing capacity, Spatial properties (concrete cover/duct voids), Other actions (wind/temperature/earthquake), Cracks (width/length/pattern)

Images

(No images available for this case study.)

Documents

Icon-link2.png
Icon-link2.png



This case study was contributed by Werner Lienhart of Graz University of Technology. Last edited by technical staff.