Sweden
Properties
Element type
:
Country
Country code
:
SE
Case studies
The following case studies are available in Sweden:
- Concrete Trough Bridges on the Iron Ore Railway Line (case study) (created: 16-09-2021)
- Kalix river bridge (case study) (created: 16-09-2021)
- Kiruna bridge (case study) (created: 12-08-2021)
- Åby river bridge (case study) (created: 16-09-2021)
- Örnsköldsvik bridge (case study) (created: 16-09-2021)
Partner organisations
The following IM-SAFE partner organisations are located in Sweden:
(No partner organisations found.)
Maintenance management data
Routine monitoring interval
:
6 (years)
Inspection interval
:
2 (years)
Main inspection interval
:
5 (years)
Number of condition classes
:
5
Phase I maintenance strategies
:
Corrective maintenance
Phase II maintenance strategies
:
Phase III maintenance strategies
:
Predictive maintenance
Data informed static quality control elements
:
Preparatory work
On-site inspection
Laboratory test
Assessment of condition or reliability
Assessment of safety
On-site inspection
Laboratory test
Assessment of condition or reliability
Assessment of safety
Data informed dynamic quality control elements
:
Assessment of remaining service life
Static quality control frameworks
:
Inventory
Vulnerable zones
Failure mode
Vulnerable zones
Failure mode
Dynamic quality control level
:
Level 1 (CI => RI)