A5.18 - Brücke über die Rotwildquerung (analysis)

A detailed assessment of the condition of an object.

Properties

Element type
:
Analysis
Summary
:
Monitoring of the behaviour of the unique designed jointless expansion joints.
Case type
:
Consulting
Initiation of assessment
:
Anticipated change of design working life, Value engineering
"Value engineering" is not in the list (Anticipated change of design working life, Required reliability check, Post event and anticipated damage, Structural deterioration, Pure research interest, Other) of allowed values for the "Initiation of assessment" property.
Predominant verification type
:
Engineering judgement
Predominant verification scale
:
Structural component
Structural analysis
:
Proxy limit state (e.g. corrosion initiation)
"Proxy limit state (e.g. corrosion initiation)" is not in the list (Ultimate limit state, Fatigue limit state, Serviceability limit state, Proxy limit state, Other) of allowed values for the "Structural analysis" property.
Information updating
:
Tables
Operational intervention
:
Monitoring