Leziria bridge

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2007
Composed of materials
:
Prestressed concrete, Reinforced concrete
Description
:
With a total length of 12 km including its approach viaducts, the Leziria bridge in one of the longest bridges in the world. It is a part of highway A10 outside of Lisbon and is made of prestressed concrete. The bridge has been though-roughly monitored since it was constructed. This case study outlines a set of good practices for advanced FE-modelling in assessment of large existing structures.
Location coordinates
:
39°00'46"N 8°56'04"W
Country
:
Physical address
:
Carregado/Benavente
Loading map...