Nordbrücke (case study)

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Crossection: Plate beam Longitudinal section: Continuous beam 5 spans 80m each. total length:333m width:20m


Object description

(No object description available.)

Civil engineering type
:
Road network Bridge
Year of construction
:
1964
Composed of materials
:
Location coordinates
:
48° 15' 14.93" N, 16° 22' 40.72" E
Country
:
Loading map...

Object analysis

(No analysis summary available.)

Case type
:
Consulting

Object state

(No object state summary available.)

Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Deformation, Traffic information via WIM/BWIM, Dynamic response (acceleration/damping/frequencies)

Images

Nordbrücke 1.jpeg

Documents

(No documents available for this case study.)



This case study was contributed by Fritz Binder of Asfinag Baumanagement GmbH. Last edited by technical staff.