Soldarności Bridge

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2007
Composed of materials
:
Shotcrete, Steel
Description
:
The bridge was built in 2007. The bridge is situated in Plock over Wisla River. It has a total length 615 m and width 27,5 m. The bridge in a five-span arrangement. The lengths of the spans are: 4 x 60 m and 375 m. Like we can see main span (375 m) is the longest span in Poland for cable-stayed bridge.
Location coordinates
:
52.52120246832903, 19.72725176932512
Country
:
Physical address
:
Płock
Loading map...