Soldarności Bridge

Revision as of 14:13, 10 August 2021 by Eoord (talk | contribs) (CSV import civil engineering works)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2007
Composed of materials
:
Shotcrete, Steel
Description
:
The bridge was built in 2007. The bridge is situated in Plock over Wisla River. It has a total length 615 m and width 27,5 m. The bridge in a five-span arrangement. The lengths of the spans are: 4 x 60 m and 375 m. Like we can see main span (375 m) is the longest span in Poland for cable-stayed bridge.
Location coordinates
:
52.52120246832903, 19.72725176932512
Country
:
Physical address
:
Płock
Loading map...