Weikendorf bridge

Revision as of 14:13, 10 August 2021 by Eoord (talk | contribs) (CSV import civil engineering works)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Railway network Bridge
Year of construction
:
1967
Composed of materials
:
Reinforced concrete
Description
:
The single span reinforced concrete railway bridge was built in 1967 and repaired in 2014. The main bearing elements of the superstructure is a concrete girder and a concrete slab and the substructure consists of abutments and wing walls. It is located just outside of Weikendorf.
Location coordinates
:
48.340716, 16.754357
Country
:
Physical address
:
Weikendorf
Loading map...