Semmering Base Tunnel (analysis)

A detailed assessment of the condition of an object.

Properties

Element type
:
Analysis
Case type
:
Consulting
Initiation of assessment
:
Anticipated change of design working life, Required reliability check (by owner or authorities)
"Required reliability check (by owner or authorities)" is not in the list (Anticipated change of design working life, Required reliability check, Post event and anticipated damage, Structural deterioration, Pure research interest, Other) of allowed values for the "Initiation of assessment" property.
Predominant verification type
:
Engineering judgement
Predominant verification scale
:
Structural system
Information updating
:
Regression
Physical intervention
:
Repair, Strengthening or upgrading
Operational intervention
:
Maintenance, Monitoring

Relations with other elements