Feuerwehrzufahrt TU Vösendorf (case study)

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Simple overpas, frame bridge.


Object description

(No object description available.)

Civil engineering type
:
Road network Bridge
Year of construction
:
2006
Composed of materials
:
Location coordinates
:
48° 7' 14.04" N, 16° 19' 29.61" E
Country
:
Loading map...

Object analysis

Crack monitoring incl. Temp. 1value/h

Case type
:
Consulting

Object state

(No object state summary available.)

Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Cracks (width/length/pattern)

Images

Vösendorf 1.jpeg

Documents

(No documents available for this case study.)



This case study was contributed by Fritz Binder of Asfinag Baumanagement GmbH. Last edited by technical staff.