Kiruna bridge

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
1959
Composed of materials
:
Reinforced concrete, Prestressed concrete
Description
:
This 122 meter long bridge with five continuous spans was built in 1959 along highway E10 near Kiruna in northern Sweden. The superstructure consist of three prestessed concrete girders with a reinforced concrete slab on top. The prestressing system is post-tensioned system with four to six tendons parabolically aligned in each girder. One tendon is composed of 32 strands with diameter 6 mm.
Location coordinates
:
Country
:
Physical address
:
Kiruna