Rędziński Bridge

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Properties

Element type
:
Civil engineering work
Civil engineering type
:
Road network Bridge
Year of construction
:
2011
Composed of materials
:
Reinforced concrete, Steel
Description
:
The bridge was built in 2011. The bridge is situated in Wroclaw over Odra River. It has a total length 612 m and width 38,58 m. The bridge in a four-span arrangement. The lengths of the spans are: 50 m, 256 m, 256 m and 50 m. This bridge has got the highest pylon in Poland (122 m). In this case was designed H-type reinforced concrete pylon which was common for both load-bearing structures.
Location coordinates
:
51.156786034691926, 16.95941449810424
Country
:
Physical address
:
Wrocław
Loading map...