The bridge over Åby River on the main railway line in northern Sweden was built in 1955 with a length of 33 m. A code-based assessment carried out in 1994, indicated that the bridge was damaged because of fatigue. According to the report, it was the overlapping continuous plate in the stringer-to crossbeam connection that had insufficient capacity. There were no visible cracks in this location, Häggström (2016), MAINLINE (2014).
Object description
(No object description available.)
Civil engineering type
:
Year of construction
:
1955
Composed of materials
:
Location coordinates
:
65° 24' 58.16" N, 20° 22' 25.03" E
Country
:
Loading map...
{"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"auto","height":"350px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":false,"defzoom":6,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u00c5by river bridge\n\u003C/p\u003E\u003C/div\u003E","title":"\u00c5by river bridge\n","link":"","lat":65.41615555555556,"lon":20.373619444444444,"icon":"/images/imsafe/c/c8/Blue-marker.png"}],"imageoverlays":null}
Object analysis
Measurements of strains and deflections were carried out, while the bridge was in service. Due to the risk for a fatigue failure and bumpy connections it was decided to exchange the bridge. The old bridge was moved to a new site, close to the old one, and loaded to failure.
Object state
It was found that the bridge could withstand loading corresponding to four times the highest permitted axle-loading, or twice the design load for new bridges, before exhibiting an obvious non-linear behaviour regarding vertical displacement in the mid span. The peak load was achieved at loading approximately 50% higher than the initial non-linear behaviour, where lateral buckling of the top chord limited the structure from carrying more load. The failure can be concluded as being redundant without brittle failure of any of the connections. The results helped save a twin bridge at Rautasjokk on the Iron Ore Line north of Kiruna.
Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Deformation, Displacement
Images
Documents
This case study was contributed by Frida Liljefors of Norwegian University Of Science And Technology. Last edited by technical staff.