German bridge examined by e.g. Hansen (case study)

From IM-SAFE Knowledge Base
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
A four-span post-tensioned concrete bridge was investigated for fatigue. One box-shaped girder serves each direction of travel. The closed box cross section prevents the equipment from vandalism.


Object description

A four-span post-tensioned concrete bridge was investigated for fatigue. One box-shaped girder serves each direction of travel. The closed box cross section prevents the equipment from vandalism.

Civil engineering type
:
Road network Bridge
Year of construction
:
Composed of materials
:
Location coordinates
:
Country
:

Object analysis

An assessment of structure specific fatigue was carried out. Traffic axle loads and the resulting strains in the tendons were measured. The fatigue assessment was based on S-N-curves and the PM-rule for accumulation of damage.

Case type
:
Research

Object state

Global deflection was measured at two locations of the bridge. Strain gauges and temperature sensors were installed at a number of locations, and axle loads were measured after calibration to known axle loads. A fatigue assessment was carried out for concrete, reinforcement and tendons.

Observed deterioration processes
:
Observed damage types
:
Performance indicators
:
Deformation, Traffic information via WIM/BWIM

Images

(No images available for this case study.)

Documents

Icon-link2.png



This case study was contributed by Frida Liljefors of Norwegian University Of Science And Technology. Last edited by technical staff.