The data given in D1.1 to D1.3, as well as a further, partly necessary detailed COP survey of the IMSAFE project including information from COST TU1406, were used to obtain an overview of the elements of static quality control applied in practice. The map shows the result of these surveys.
The data given in D1.1 to D1.3, as well as a further, partly necessary detailed COP survey of the IMSAFE project including information from COST TU1406, were used to obtain an overview of the elements of static quality control applied in practice. The map shows the result of these surveys.
The table below displays, for all countries for which data is available, the data informed static quality control elements utilised.
{{#ask:[[Category:Countries]][[Data informed static quality control elements::+]]|limit=100|format=table|headers=plain|class=datatable compact cell-border
|?Category:Data informed static quality control elements - Preparatory work#Yes,=Preparatory work
|?Category:Data informed static quality control elements - On-site inspection#Yes,=On-site inspection
|?Category:Data informed static quality control elements - Laboratory test#Yes,=Laboratory test
|?Category:Data informed static quality control elements - Assessment of condition or reliability#Yes,=Assessment of condition or reliability
|?Category:Data informed static quality control elements - Assessment of safety#Yes,=Assessment of safety
}}

Latest revision as of 16:52, 30 April 2022

The map below displays, for all countries for which data is available, the data informed static quality control elements used.


Loading map...
Legend:
  PW, OI, LT, ACR
  PW, OI, LT, ACR, AS
  Unknown


PW = Preparatory work; OI = On-site inspection; LT = Laboratory test; ACR = Assessment of condition or reliability; AS = Assessment of safety


Data informed static quality control elements used


The data given in D1.1 to D1.3, as well as a further, partly necessary detailed COP survey of the IMSAFE project including information from COST TU1406, were used to obtain an overview of the elements of static quality control applied in practice. The map shows the result of these surveys.


The table below displays, for all countries for which data is available, the data informed static quality control elements utilised.